| Clinton River Cut-Off -
Boating Access Site |
Civil
Division: Harrison Twp
|
County:
Macomb
|
Coordinates:
Lat:42.562277, Lon:-82.843323
|
Take the I-94 E ramp to
Port Huron - go 7.3 mi
Take the Metropolitan Pky exit 236 - go 0.3 mi
Turn right at 16 Mile Rd/Metro Pky - go 0.2 mi
Turn right at Crocker Blvd - go 0.7 mi
Turn right at Jefferson Ave - go 0.3 mi
|

|
Town,
Range, Section: , ,
|
Waterbody:
Lake Saint Clair
|
Surface
Area (Acres):
|
| Site
Rules: |
Ramp
Description:
A hard-surface ramp with sufficient water depth and lake or impoundment
size to accommodate all trailerable watercraft (minimum of 2.5 - 3 feet
deep at a distance of 20 feet from shore). The site is signed.
|
Site
Administrator:
Mt Clemens Field Office
|
Contact
Number: (586) 465-2160
|
Total
Parking Spaces: 130
|
| Water
Craft Controls: This site has a watercraft control |